Enquiry checklist
Record the model or part dimensions, application, required quantity and date. For a reorder, add the existing article number. For a new task, describe the sensitive areas of the part and how it will be removed.
Download the enquiry checklist (CSV, German)
Sample test report
Document the pallet tested, the part revision and the test conditions. Record observations as well as open points and who is responsible for approval. A sample is only meaningful under the conditions in which it was actually tested.
Download the sample test report (CSV, German)
Process mapping
Note every station between loading and removal. Take storage times, handovers, means of transport and, where applicable, cleaning into account. The template helps you see the full cycle of a workpiece carrier.
Download the process mapping template (CSV, German)
Technical product documents
Current dimensioned drawings and approved material data for the MFP version you need are available on request. Use the current document revision for your selection. Older documents are useful for identification, but are not an automatic approval for a new application.
Request technical documents · Plan a sample test
Manz data sheet and dimensioned drawings
Dimensions, pocket sizes and properties of all five models from the Manz data sheet 08/2020 are summarised in the article Manz data sheet. The dimensioned top views can be downloaded as SVG files from the product pages.
